Natick Center Commuter Rail Station Reconstruction

The Natick Center MBTA Station is undergoing a comprehensive redesign for accessibility improvements under a state-funded contract by the MBTA. AECOM is designing a new station, using the 2014 town-funded conceptual design as a starting point. Preliminary design was completed in 2017 and final designs completed in 2019, both presented for comment at a public meetings. The MBTA has contracted with Daniel O'connells Sons, Inc. for the construction of the new station.  Construction is scheduled to begin in Spring 2020, with ongoing work through 2022. 