|
Award to Markings, Inc., as per bid. For bond calculation purposes, the Town anticipated 612 lf of 4” yellow double line water based material @ $.081/lf (=$49.57). It also estimated 338,738 lf of 4” white single line water based material @ $.042/lf (=$14,226.99). $14,276.56.
|
|
6/12/2017 5:00 PM
|
|
Open Until Contracted
|
|